Back on a barn conversion yesterday and among other things I need to dig about 200 metres of trench a metre deep.im in south norfolk on heavy clay ground and at my home we only had 182mm since jan first and reall none for around 7/8 weeks.we have about 10 inches of topsoil and then yellow clay and flints.tried to start a trench on a stubble field to put drains in and gave up after about 15 inches.machine is brand new tb216 and brand new 12 inch trenching bucket.it got so teeth where just rubbing on clay making it it shine and that was with all digger weight on blade and bucket teeth.even with massive cracks in the ground it made no difference.i reckon we will need 3/4 inches before it makes much difference.got 3 treatment plants to do on site aswell but no hope there either.this is the barn in pic.its huge at over 30 metres long