" New homes must be built with on-site renewable energy generation and heat pumps from 2028, government says

Future Homes and Buildings Standard will come into force from March 2027 but with an 12-month transition period
The government has confirmed that plans to require new homes to be built with on-site renewable energy generation, such as solar panels, along with heat pumps, will fully apply from 2028. "

what's that gonna add to yer average hutch ??
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
more BS .... just make settlement within terms a legal requirement with automatic litigation and BIG FINES, against late payers .. end of - works OK in Germany and has done for years

 
B

bobthebuilder

Well-known member

" New homes must be built with on-site renewable energy generation and heat pumps from 2028, government says

Future Homes and Buildings Standard will come into force from March 2027 but with an 12-month transition period
The government has confirmed that plans to require new homes to be built with on-site renewable energy generation, such as solar panels, along with heat pumps, will fully apply from 2028. "

what's that gonna add to yer average hutch ??
15grand
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better

" Government says latest £66bn figure could come after intervention
The chair of HS2 Ltd is set to step down, the Department for Transport (DfT) has announced as it revealed yet another cost rise for the troubled high-speed rail project. Sir Jon Thompson, who was a veteran civil servant before taking his role at the government-back delivery body, will step back from his role in the Spring after four years on the board. " :mad::mad: after taking how many millions in 'salary'??? :unsure:o_O:rolleyes::mad:


wonder how big the brown envelope was :rolleyes::unsure:


WTF? o_O:unsure::oops::oops::censored:

" HS2 has begun a full programme reset which may not be complete for more than a year, MPs were told this week.

Senior leaders on the project from the Department for Transport (DfT) and the delivery body itself were subjected to a grilling by the public accounts committee yesterday over the scheme’s rising costs "

more HS2 bull sh!t ... " In October transport secretary Louise Haigh said: “ It has long been clear that the costs of HS2 have been allowed to spiral out of control, but since becoming transport secretary I have seen up close the scale of failure in project delivery – and it’s dire.” "

https://www.theconstructionindex.co.uk/news/view/hs2-chief-commits-to-fix-hs2-crisis

o_O:censored::LOL:


1778498130737.png
:oops::oops::oops::oops:o_O:censored::mad:

 
Lancs Lad

Lancs Lad

Well-known member

View attachment 82060:oops::oops::oops::oops:o_O:censored::mad:

Drive along the M6 toll and m42 section. Absolutely insane level of engineering!
Eye watering costs how do they get them so far out though?
 