R
Russell
Well-known member
Does anyone do moling or mobile shot blasting?
What sort of day rate do you get?
What sort of day rate do you get?
That’s a diverse set of jobsDoes anyone do moling or mobile shot blasting?
What sort of day rate do you get?
Both use a compressor.That’s a diverse set of jobs![]()
Be careful you can waste many an hour waiting for a grundamat to appear somewhere completely random ....I knowBoth use a compressor.
A compressor plus mole and airspade are on my shopping list.
Anything to do with building around a protected tree seems to be charge what you like territory.
Or have to start digging when it won't back outBe careful you can waste many an hour waiting for a grundamat to appear somewhere completely random ....I know![]()
Yeah I have been thereOr have to start digging when it won't back out
They don’t like the ground to be too soft so for example in soft clay they don’t travel well, I think they call it swimming. I usually try to mole as deep as you can if the ground above isn’t very compacted they can head for the surface. I think they recommend as a general rule that you mole 10 times the moles dia in depth, so you want to be at least 450 mm deep with a 45 mm dia mole though I would be double that depth if I could.What are they like in clay?
Can you not find it with the cat and Genny?
Hose to the mole is non conductive so you can't put a signal down it to trace it. All you can rely on is ur ear to the ground. Unless you know the ground you have to resist the temptation to try and mole too far in one go, although often you've no choice. Tbh I very rarely use mine now as if you're job involves any of the ultilities companies following on after you they don't like moles (their own lads f**ked the job by putting pipes in 6 inch deep with them).What are they like in clay?
Can you not find it with the cat and Genny?
Ever done any blasting? Would need to be a good earner to do it out of choice for me.Does anyone do moling or mobile shot blasting?
What sort of day rate do you get?
Hose to the mole is non conductive so you can't put a signal down it to trace it. All you can rely on is ur ear to the ground. Unless you know the ground you have to resist the temptation to try and mole too far in one go, although often you've no choice. Tbh I very rarely use mine now as if you're job involves any of the ultilities companies following on after you they don't like moles (their own lads f**ked the job by putting pipes in 6 inch deep with them).
I take him must have hit it setting the mole off then?They scare me after a local lad on the grass went straight through the high voltage power supply to a town. He lived but last I heard still in hospital 6 months on.
How the hell it happened I don't know but I know I would rather hand dig than cook myself
I take him must have hit it setting the mole off then?
I used to recon you needed £60 hr around 5 years ago for mobile blasting when you are unable to recover media & quite a lot of media goes through a 10 mm nozzle in an hour.Last bit of shot blasting I had done was 500£ plus vat a day.. well over 5 years ago now.
Plus white diesel nowadays!I used to recon you needed £60 hr around 5 years ago for mobile blasting when you are unable to recover media & quite a lot of media goes through a 10 mm nozzle in an hour.
I think a mini loader (Sherpa) would pay for itself very quickly in your area.I'm sure it's dirty and a bit unpleasant but if it pays and there's work there? Can't be too fussy over here and I'm 99% sure something cool like a bigger digger or a loader would not earn a penny.
No but I like the easy to store and multi purpose aspect of compressor and the accessoriesEver done any blasting? Would need to be a good earner to do it out of choice for me.
Ah that could scupper it then. It's nearly all clay over here, sometimes hard but often wet enough to stick in the bucket.They don’t like the ground to be too soft so for example in soft clay they don’t travel well, I think they call it swimming. I usually try to mole as deep as you can if the ground above isn’t very compacted they can head for the surface. I think they recommend as a general rule that you mole 10 times the moles dia in depth, so you want to be at least 450 mm deep with a 45 mm dia mole though I would be double that depth if I could.