Vinnys Ventures

Vinpetrol

Vinpetrol

Well-known member
Here we go . The posts might be a bit sporadic by the time I’ve filtered out all the pics where the h&s boys and girls might raise an eyebrow or we haven’t got the right ppe on or we might upset the clients or main contractors or other contractors I’ve undercut !
 
Gunners

Gunners

Well-known member
Here we go . The posts might be a bit sporadic by the time I’ve filtered out all the pics where the h&s boys and girls might raise an eyebrow or we haven’t got the right ppe on or we might upset the clients or main contractors or other contractors I’ve undercut !
I dont think any of the above will bother us here. You've seen what we all get up to right? 😁
 
T whiting

T whiting

Well-known member
That's why I try to take photos without people in it just causes less issues
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
looking forward to this thread :giggle::giggle::LOL:
 
Vinpetrol

Vinpetrol

Well-known member
7EB1915B-D986-48F4-BB87-9072327F6A02.jpeg
 
Vinpetrol

Vinpetrol

Well-known member
C9172A08-4FCE-4259-8507-AC2E4C1120C6.jpeg

I recently cut this drive in for a neighbour, they had a shared drive on the other side of the property so this made more sense for them. I done it with the duck . I finished it after this pic with tar plannings which is holding up well
 
Vinpetrol

Vinpetrol

Well-known member
3FB946F5-2037-47EC-8213-9641A1965BAE.jpeg

This is underbuildings we are doing for a local contractor . The houses are very low energy and use renewable resources wherever possible . We get the pads completed , all the drainage and landscaping done and the services where possible before they come to site with the building .
 
Vinpetrol

Vinpetrol

Well-known member
Is that next to the boat house? We did steel work for a few houses in findhorn in the last 2 years.
Hi Mike
Yes it runs from the marina down behind the houses to the centre of the village . We started it just before the lockdown and finished it once we got back to work . The spec is a cedec finish for most of it and some areas were concrete . We actually thought it should all be concrete as the path floods in places during high tides . There is a new house backing on to the beach the path runs behind , did you work on it ?
 
Last edited:
Quattromike

Quattromike

Well member-known
We did a steel A-frame for a glass gable, it was a stone throw from the boat house. Was built on what seemed like a sand bank. Only ever seen it at foundation level when we put steel in. They normally do a good finish on their houses though.
 
Vinpetrol

Vinpetrol

Well-known member
We did a steel A-frame for a glass gable, it was a stone throw from the boat house. Was built on what seemed like a sand bank. Only ever seen it at foundation level when we put steel in. They normally do a good finish on their houses though.
Yes that’s the house , it has a big garage with an annexe above it as well . We took a branch off the path behind that house down to the driveway that accesses it . It’s a small world . Do you do much other work up this way ? I seen in one of your previous posts you’d been up about Invergordon
 
Quattromike

Quattromike

Well member-known
Not a huge amount, findhorn is only about 40min from us, we do bits at invergordon distillery. We're mostly around Speyside.
 
Top