A couple of years ago we applied for planning permission to build a barn in our field. Planning permission was refused due to neighbours complaining about potential noise issues. We are planning to keep 50 chickens and 6 goats. Our property is in a rural location (Green belt) and our closest neighbours is 75 yards away, no chance in hell that they will have any noise or odour issues.
We appealed the decision and had noise and odour modelling done, subsequently planning permission was granted. Before we can use the building for its intended purpose we need to provide a rain water drainage plan to the council. This is were our problems start.
For a soakaway we need to dig trail pits and calculate the water infiltration rate. Our soil is heavy clay and has hardly any infiltration at all. Today I dug out an area to about 3 metres deep. With the JCB 8016, so that was a challenge!
Unfortunately a 3 metres I am still on clay soil and any water poured onto it just sits there. I am considering my options here. I can dig a ramp into the pit so that I can dig it down to about 5 metres, obviously making it large enough to avoid being killed by a cave in. Hire a larger excavator that digs down about 25 feet. Or hire a post hole auger for the JCB and make extension pieces to get 25 feet deep.
Every option has its own problem as we live on a very narrow road and a large excavator will have to be walked from the main road to the site, roughly 1/2 mile. Even a professional drill will have to be dropped off at the main road as anything over 7.5 tonne will not fit down our lane. Even if you wouldn’t mind the scratches then there is a 90 degree corner that you won’t get past. It will then be a case of reversing back up the lane.
As all of you are in the trade, I am sure that you have come across a soakaway on clay ground problem before. Any advice will be greatly appreciated.
We appealed the decision and had noise and odour modelling done, subsequently planning permission was granted. Before we can use the building for its intended purpose we need to provide a rain water drainage plan to the council. This is were our problems start.
For a soakaway we need to dig trail pits and calculate the water infiltration rate. Our soil is heavy clay and has hardly any infiltration at all. Today I dug out an area to about 3 metres deep. With the JCB 8016, so that was a challenge!
Unfortunately a 3 metres I am still on clay soil and any water poured onto it just sits there. I am considering my options here. I can dig a ramp into the pit so that I can dig it down to about 5 metres, obviously making it large enough to avoid being killed by a cave in. Hire a larger excavator that digs down about 25 feet. Or hire a post hole auger for the JCB and make extension pieces to get 25 feet deep.
Every option has its own problem as we live on a very narrow road and a large excavator will have to be walked from the main road to the site, roughly 1/2 mile. Even a professional drill will have to be dropped off at the main road as anything over 7.5 tonne will not fit down our lane. Even if you wouldn’t mind the scratches then there is a 90 degree corner that you won’t get past. It will then be a case of reversing back up the lane.
As all of you are in the trade, I am sure that you have come across a soakaway on clay ground problem before. Any advice will be greatly appreciated.