S
Smiffy
Well-known member
Insufficient flow id think.
It's only for looks !!
Insufficient flow id think.
Use a 3PL top link and then you can manually adjust the bladePossibly. But I just know I’d end up needing a new ram!
They convert 8 tonners for boom mounted winches....Insufficient flow id think.
That’s not a totally daft idea- if I could find one suitably sized. I think the gap will be too long.Use a 3PL top link and then you can manually adjust the blade![]()
The insufficient flow would be because the flow is routed though the centre joint.They convert 8 tonners for boom mounted winches....
For the Earthmovers cover?It's only for looks !!
Back page when it’s all gone wrongFor the Earthmovers cover?
Did consider that but I’d deffo do both sides
Thats not a bad option. Max clearance and easily put back to standardA little extra work, but weld a boss onto the blade frame and just put a short arm in this bit? You’d only need to do one side I’d guess.. you’d fly 600 tracks on then View attachment 68835