Storrsy
Well-known member
This is a new one for me not having done one before. But wildlife reserve is keen to have a 4.5m span timber footbridge kit form installed. Has anyone done one before? Think they are designed to be assembled insitu but this seems awkward to me- wondering if they can be assembled first before swinging them into position- an 8 tonner would manage this.. thinking just form suitable concrete abutments, swing assembled bridge into position and bolt down? Anything else to be aware of?